Case Studies

 

The following selection of case studies shows a comprehensive cross section of the services Thomas Niamh Contracting can offer, if you require any further information on any specific projects please contact us on +44 (0)1924 895 638 or email info@thomasniamh.com

 

Project Name: Maltby Refurbishment.

Location: Rotherham

Client: Rotherham MDC.

Main Contractor: Hall Construction Group Ltd

Sector: Social Housing Low Rise

Building Type: Solid Wall Brick Construction

Project Size: 14 Properties

Product: External Wall Insulation-Render. Weber System

 

The refurbishment works were to improve the energy efficiency of solid wall brick constructed properties.

 

By externally insulating these properties in Maltby, Rotherham MDC decided that a Weber insulated render system incorporating
a 90mm EPS board was the best way to achieve the thermal performance required to meet building regulations.

 

A render brick was chosen to replicate the look of the original brick built properties.

 

The EWI works were part of a full external fabric refurbishment that included new roofs, chimneys and facias and soffit works.

Project Name: Premier Inn Refurbishment.

Location: Goole

Client: Whitbread.

Main Contractor: FME Property Solutions Ltd

Sector: Hotels

Building Type: Timber Frame

Project Size: Hotel

Product: External Wall Silicone Render. WBS Ltd System

 

The refurbishment works were to improve the appearance of one of Whitbreads most popular hotels in Goole.

 

By externally rendering this twenty year old hotel it now looks like a modern up to date building.

Being located at the side of the busy M62 motorway it is now highly visible to passing trade.

 

A WBS white 1.5mm silicone Render finish was chosen by the hotel management to match the new extension

that was completed a year ago

Project Name: Swallownest / Thrybergh Refurbishment.

Location: Rotherham

Client: Rotherham MDC.

Main Contractor: Hall Construction Group Ltd

Sector: Social Housing Low Rise

Building Type: Solid Wall Brick Construction

Project Size: 114 Properties

Product: External Wall Insulation-Render. Weber System

 

The refurbishment works were to improve the energy efficiency of a mixture of system built properties, namely Wimpey No Fines, Trusteels and Smith Finegans

 

By externally insulating these properties in Swallownest and Thrybergh, Rotherham MDC decided that a Weber insulated render system incorporating a 90mm EPS board was the best way to achieve the thermal performance required to meet building regulations.

 

Render brick was chosen to replicate the look of the original brick built properties and a through coloured render was chosen to complement the rest of the estate.

Project Name: Acre Hall Primary School - Sports Hall Refurbishment.

Location: Flixton

Client: Acre Hall Primary School.

Main Contractor: Link Contracting Ltd

Sector: Education

Building Type: Solid Brick Construction

Project Size: 300 sq metres

Product: External Wall Insulation and Silicone Render. WBS Ltd System

 

The refurbishment works were to improve the appearance of the existing sports hall together with providing thermal energy efficiency to meet the current building regulations.

 

The completion of these works have rejuvenated an old sports hall into a modern building.

 

The WBS cream and grey 1.5mm silicone Render finish was chosen by the school governor to up hold the appearance of the school.  And by incorporating a 90mm EPS board the thermal performance was easily achieved.

 

The project was completed on budget and in front of programme.

 

Project Name: Greasborough Refurbishment.

Location: Rotherham

Client: Rotherham MDC.

Main Contractor: Hall Construction Group Ltd

Sector: Social Housing Low Rise

Building Type: Solid Wall Brick Construction

Project Size: 115 Properties

Product: External Wall Insulation-Render. Weber System

 

The refurbishment works were to improve the energy efficiency of solid wall brick constructed properties.

 

By externally insulating these properties in Greasborough, Rotherham MDC decided that a Weber insulated render system incorporating
a 90mm EPS board was the best way to achieve the thermal performance required to meet building regulations.

 

A design of through coloured render and render brick were chosen to complement the appearance of the estate.